Manufacturing

  • BOM and calculation of required material.
  • Issuing manufacturing order, manufacturing plan and actual, takt time.

Material Requirements Calculation

It’s difficult to manually calculate required materials for ordered item and manage the inventory.

  • In creation of a manufacturing order, calculates quantity of required materials according to preset BOM data automatically.
  • User can adjust quantity of material calculated by the program as well.
  • User can configure the BOM data in item master and BOM master.
  • Generating material check out order.

Collecting Production Result & Display Status

Cannot know easy if the status of production is in time of plan.

  • Imports file of production plan and records to database.
  • Collects result of production and writs to file or database.
  • Displays plan and result of the production as chart.
  • Displays result of multiple line of the same item in bar-chart in different color.
  • Alerts in case of delay.